With slower curing for the warmest southern climates, ULTRABOND® 2 provides a long working time of 28 minutes @ 75°F (24°C) and in-service temperatures to 180°F. For anchoring threaded rod into concrete, ULTRABOND® 2 has a 1:1 mix ratio and 28 month shelf life.
ULTRABOND 2 Anchoring Epoxy 21.2 FL. OZ.
Call for Price
Categories: ADHESIVES TECHNOLOGY, Building Materials
Be the first to review “ULTRABOND 2 Anchoring Epoxy 21.2 FL. OZ.” Cancel reply
Related products
Building Materials
Building Materials
Call for Price
Building Materials
Call for Price
Building Materials
Building Materials
Call for Price






Reviews
There are no reviews yet.